ProfessionalAvailable now

Productivity Calculator

Estimate duration and labour cost from a user-defined output rate.

This calculator is part of a paid level

Unlock this calculator with a single purchase; access stays on your account for life.

Estimate duration and labour cost for work planning. Enter work quantity, crew size, daily output per worker and daily worker cost. Free to use without signing in.

Method and assumptions

Accepted output per paid labour-hour

  • Observed rate=Σ accepted quantity / Σ all paid labour-hours, not mean of shift ratios
  • Required hours=remaining quantity/observed rate; shifts=hours/(crew×paid hours/shift)
  • Future labour cost=ceil(shifts)×crew×daily rate; rework hours remain inside denominator
  • https://www.bls.gov/opub/hom/msp/calculation.htm — BLS output/hours concept; physical site units are not an official real-output index.
  • Shifts include all workers’ paid hours including downtime/rework; accepted output only. Same work, units and conditions; no simple average of ratios.
  • Projection assumes the same rate; increasing crew size guarantees neither linear production nor critical-path dates. Future cost only; no repricing actuals, holidays, equipment or materials.

Next step and related links

Free calculators are open to everyone, and CSV export is free for everyone too. Project saving and PDF/Excel reports come with Professional, and integrated workflows with Premium.