Quantity & Execution Cost Kit
When to use it
Before ordering: turn dimensions into quantity and cost, keeping waste separate.
Net quantity: required volume before an ordering-waste allowance.
What you get after purchase
- Interactive takeoff with 48 inputs: structural elements, finishes, waste, rates, material allocations, preliminaries, contingency, margin and budget.
- Concrete volume, formwork area and rebar weight per element, with editable steel density for each.
- Separate waste for each material and a priced bill of quantities that keeps net and order quantities apart.
- The calculator has 48 inputs: elements, waste and rates, then usable allocations for four materials, preliminaries, contingency, selling margin and budget. Four tables separate measurement, purchasing and the pricing bridge, with net/waste cost bars and margin sensitivity. Stock reduces new purchasing, not consumption cost; pricing excludes tax, and reinforcement estimates need approved bending schedules.
- Bilingual Excel file: sectioned BOQ with formulas, a dimension takeoff sheet (no. × L × W × H) and a section summary.
- Gift book: Execution & Quantity Surveying Book.
A fixed-number teaching example, open to everyone before purchase, so you can see how it works.
Supporting your chances of success
This kit combines precise calculations with guidance and organisation to help you work towards your goal. We help you organise inputs, understand options and assess strengths and risks, then suggest practical steps suited to its subject — such as pricing, cash flow or marketing.
Guidance supports decisions, not guaranteed success; estimates depend on the accuracy of your inputs.
Understand the kit step by step
The kit links measurement, purchasing and pricing: footings, columns, slab and beams, then walls, plaster and tiles. Separate installed net quantities, waste and usable allocation. Slab plan includes beam footprints excluding openings; formwork deducts footprints before adding beam soffits and sides. Density steel is a budget estimate; approved scheduled total replaces it when available.
What to prepare before starting
Prepare approved drawing revisions, element schedules, openings and separate supply/installation rates. Set blocks per m² and plaster faces; review laps before applying steel waste. Gather usable stock, a cost budget, preliminaries, contingency and selling margin.
From information to a decision
- Measure concrete without repeating slab/beam overlap; keep formwork separate from concrete volume.
- Review reinforcement per element; beam density here applies to the drop only, not the full section. Replace total with approved scheduled steel when available.
- Deduct wall openings, calculate blocks from the module and plaster from faces; never sum different physical units.
- Material cost = waste-adjusted order × supply rate; installation = net × installation rate. Subtract stock from new purchases, not consumption cost.
- Add preliminaries then contingency; divide cost by one minus selling margin. Compare pre-profit cost with budget excluding tax.
- In Excel choose measurement type, complete dimensions and drawing reference. Resolve incomplete measurements and unpriced items before approving totals.
A simple example to explain the idea
Introductory case:10×8×0.20 slab=16m³;5% waste gives16.8m³. Supply250 per unit and installation50 on net:16.8×250+16×50=5000.8% preliminaries then5% contingency gives5670;15% selling margin gives6670.59 excluding tax. Values are teaching assumptions in one chosen currency, not supplier quotes.
These figures are illustrative, not approved prices or guaranteed forecasts; they may differ from the worked example below.
How to interpret and use the result
Charts compare net and waste costs in one monetary unit and show margin sensitivity at fixed cost. Waste is already within direct cost, never added twice. Usable allocation reduces new purchasing, not consumption. Selling price, profit and cost budget are distinct indicators.
A common mistake to avoid
Never buy steel solely from density estimates. Beam junctions, slab edges and column footprints require specific measurement review; this is not a bending schedule or structural design. Calculator pricing excludes tax; your contract governs measurement.
Reading the detailed operating plan
The calculator has 48 inputs: elements, waste and rates, then usable allocations for four materials, preliminaries, contingency, selling margin and budget. Four tables separate measurement, purchasing and the pricing bridge, with net/waste cost bars and margin sensitivity. Stock reduces new purchasing, not consumption cost; pricing excludes tax, and reinforcement estimates need approved bending schedules.
Gift book with the kit
Execution & Quantity Surveying Book
After payment you choose the book edition — bilingual or English — and it is added to your library with the kit.
Have a quotation or claim?
Check it with the quote and claim checker before you sign.
Open the checker
