Quote & Claim Checker
Upload a contractor quotation, progress claim or BOQ and get a clear report in minutes: overpriced items, missing scope, arithmetic errors, contract risks and ready negotiation questions.
How it works
- 1Buy one report or a three-report pack and pay securely; credit is added instantly.
- 2Choose the document type: quotation, progress claim or BOQ.
- 3Upload a PDF or clear photo up to 10 MB and add city, project type and area if known.
- 4Wait one to two minutes while AI reviews every line, re-adds totals and checks terms.
- 5Open the report from My reports, print it as PDF or send the ready questions to the contractor.
Tips before uploading and for dealing with the contractor
- Ask for an itemised quote with quantities and unit rates, not just a lump sum.
- Compare at least three quotes for the same specification before negotiating.
- Keep the advance to 10–20% and tie payments to documented progress.
- Make sure there is a clear duration, delay penalty and post-handover warranty.
- Require named specifications and brands instead of vague phrases like “top quality”.
- Approve any extra work in writing with an agreed price before it starts.
Pricing
English letters (capital and small) and numbers only.
One report
—
3 reports
—
Sample report (illustrative)
A fixed example showing what you receive; its figures are hypothetical.
Overall verdict
Negotiate before signing
Villa fit-out quotation (illustrative example) of AED 412,000. Most rates are within market range, but three items are high, waterproofing is missing, and payment terms favour the contractor.
Detected total: 412,000 AEDConfidence: Medium
Items that look overpriced(3)
| Item | Quoted | Indicative range | Why |
|---|---|---|---|
| Porcelain tiles 60×60 incl. installation | AED 185/m² | AED 110–140/m² | Origin and grade are not specified; the rate fits imported premium grade. |
| Interior paint, three coats | AED 48/m² | AED 25–35/m² | Paint type is not specified and the rate is above usual for three coats. |
| Gypsum board ceilings | AED 120/m² | AED 75–95/m² | No concealed lighting or special design details justify the difference. |
Missing scope or quantities(2)
- Waterproofing for bathrooms and kitchen: Not mentioned; its absence means later extra cost or leak risk.
- Debris removal: Not stated whether included.
Arithmetic errors(1)
- Electrical section total: Items sum to 38,400 but the stated total is 41,400 (difference 3,000).
Contract risks(3)
- 50% advance payment (High)
Ask for 20–30% against a bank guarantee, the rest by progress. - No delay penalty (Medium)
Add a daily penalty capped at 10% of the contract value. - Warranty period not stated (Medium)
Request at least one year on finishing works.
Questions to ask the contractor
- What is the origin and grade of the quoted tiles?
- Is waterproofing included, and which type?
- Why does the electrical total differ from its items?
Negotiation advice
- Fix materials by brand and grade before negotiating price.
- Negotiate the three high items; expected saving AED 18,000–26,000.
- Tie payments to photo-documented milestones.
This report supports your decision and does not replace review by a licensed engineer or quantity surveyor. Indicative prices are estimates and vary by country, specification and date.