Current Calculator
Calculate current from load and voltage.
Project & Input Data
Your project criterion: enter the value from your governing code, specification or approved supplier data. No standard value is assumed.
Your project criterion: enter the value from your governing code, specification or approved supplier data. No standard value is assumed.
Embedded standards & references
- Schneider Electrical Installation Guide P/S, voltage-drop and Q correction relations; not cable selection
Results are engineering aids and require verification by a qualified professional before use on a real project.
Engineering Assumptions
Direct calculation — Single sinusoidal circuit with lagging load
- Three-phase voltage is line-to-line with balanced sinusoidal load and lagging displacement factor. Power input is electrical, not mechanical output. No imbalance, harmonics or motor-efficiency model. Independent S is not merged with P/PF.
- Voltage drop is approximate using operating-temperature resistance and path reactance from product data, with one-way length. No assumed temperature correction, ampacity or protection. Capacitors are Q arithmetic only, no stage/resonance selection; a target below existing PF gives zero correction, not reduced PF.
- Water pressure is one path at actual internal diameter, water1000kg/m³ and g=9.80665. Hazen-Williams is empirical for water, not all fluids. Elevation is signed. Equivalent lengths and devices must not be duplicated. Compare at the same flow/pressure; no pump or fire-network approval.
- Density×area demand does not simulate actual sprinkler overdischarge or balancing. Density/area/hose values require project evidence; defaults are examples, not rules. Comparison success is not conformity certification.
- https://www.electrical-installation.org/enwiki/Calculation_of_voltage_drop_in_steady_load_conditions
- https://www.electrical-installation.org/enwiki/How_to_calculate_the_level_of_reactive_energy_compensation
- https://www.epa.gov/water-research/epanet
Formula Summary
- I=P×1000/(kV×PF) OR S×1000/(kV); k=1(single),√3(balanced three)
- P/S is independent evidence; never merge inconsistent P/PF and supplied S
Built-in definitions, not code limits
| Definition | Value |
|---|---|
| Single | I:1;ΔV:2 |
| Balanced three | √3 |
| Power triangle | S²=P²+Q² |
SI constants and declared engineering relations
Results
Enter your data and press Calculate to see the results.
Engineering Insight
Keep measurements and independent inputs separate from the calculated identity; results neither design equipment nor certify conformity.
Recommended Action
Document P/S, R/X or C and pipe diameter sources; check the same operating conditions before engineering review.
Calculate electrical current for load review. Choose the supply mode and enter voltage, power factor and active or apparent power. Free to use without signing in.
Method and assumptions
Single sinusoidal circuit with lagging load
- I=P×1000/(kV×PF) OR S×1000/(kV); k=1(single),√3(balanced three)
- P/S is independent evidence; never merge inconsistent P/PF and supplied S
- Three-phase voltage is line-to-line with balanced sinusoidal load and lagging displacement factor. Power input is electrical, not mechanical output. No imbalance, harmonics or motor-efficiency model. Independent S is not merged with P/PF.
- Voltage drop is approximate using operating-temperature resistance and path reactance from product data, with one-way length. No assumed temperature correction, ampacity or protection. Capacitors are Q arithmetic only, no stage/resonance selection; a target below existing PF gives zero correction, not reduced PF.
- Water pressure is one path at actual internal diameter, water1000kg/m³ and g=9.80665. Hazen-Williams is empirical for water, not all fluids. Elevation is signed. Equivalent lengths and devices must not be duplicated. Compare at the same flow/pressure; no pump or fire-network approval.
- Density×area demand does not simulate actual sprinkler overdischarge or balancing. Density/area/hose values require project evidence; defaults are examples, not rules. Comparison success is not conformity certification.
- https://www.electrical-installation.org/enwiki/Calculation_of_voltage_drop_in_steady_load_conditions
- https://www.electrical-installation.org/enwiki/How_to_calculate_the_level_of_reactive_energy_compensation
- https://www.epa.gov/water-research/epanet
Next step and related links
Related calculators
- Voltage DropElectrical
- Power FactorElectrical
Free calculators are open to everyone, and CSV export is free for everyone too. Project saving and PDF/Excel reports come with Professional, and integrated workflows with Premium.