FreeAvailable now — free

Excavation Calculator

Estimate excavation volumes.

Project & Input Data

%

Varies significantly by soil type and compaction state — enter a project-appropriate value.

Embedded standards & references

  • Declared area/volume and product dimensions; not structural conformity

Results are engineering aids and require verification by a qualified professional before use on a real project.

Engineering Assumptions

Direct calculation — Bounded geometric measurement and separate supply balance

  • Regular rectangular measurement only; openings cover all surfaces and cannot exceed gross area. Intermediate quantities are not rounded. RICS NRM2(2021) informs measurement boundaries, not a claim to implement every deduction rule.
  • https://www.rics.org/content/dam/ricsglobal/documents/standards/october_2021_nrm_2.pdf
  • Masonry/tiles: repeating module with joint, not a cutting layout; boundaries, bond and patterns need project take-off. No mortar, grout or strength calculation.
  • Paint uses practical product-datasheet coverage per whole coat. Plaster is wet volume only, not mix constituents. Stock matches product/unit and is allocated to this work.
  • Excavation is a vertical box only, without shoring/slope design. Swell and backfill ratio are project soil data, not code values. Backfill factor=loose/compacted volume; not an additional percentage counted twice.
  • Supply is separate from consumption; packs are whole. Excavation trips use loose volume and declared capacity; weight/road limits may increase trips. Results do not authorize construction.

Formula Summary

  • Net area = length × height × count − total openings
  • Repeating module = (unit length + joint) × (unit height + joint)
  • Paint = net area × whole coats / product coverage; plaster = net area × wet thickness
  • Earth: loose = in-situ × (1+swell); backfill loose = compacted × project ratio
  • Purchase packs = ceil(max(0, requirement − compatible stock) / pack size)

Built-in measurement definitions

QuantityIdentity
AreaL×H×N−openings
Box volumeL×W×D×N
Surplusmax(0,stock−required)+purchase−max(0,required−stock)

Declared geometric identities; no normative waste or soil factor

Results

Enter your data and press Calculate to see the results.

Engineering Insight

The in-situ volume is normally used for measurement and payment, while the loose volume is what is actually hauled and drives truck trip counts. The difference directly affects disposal cost.

Recommended Action

Use a bulking factor based on the geotechnical report and plan haulage trips on the loose volume, not the in-situ volume.

Excavation is paid in-situ but hauled loose. This calculator gives both figures: the bank (in-situ) volume from your dimensions, and the loose volume after the bulking percentage you enter for the soil actually encountered.

Method and assumptions

Bounded geometric measurement and separate supply balance

  • Net area = length × height × count − total openings
  • Repeating module = (unit length + joint) × (unit height + joint)
  • Paint = net area × whole coats / product coverage; plaster = net area × wet thickness
  • Earth: loose = in-situ × (1+swell); backfill loose = compacted × project ratio
  • Purchase packs = ceil(max(0, requirement − compatible stock) / pack size)
  • Regular rectangular measurement only; openings cover all surfaces and cannot exceed gross area. Intermediate quantities are not rounded. RICS NRM2(2021) informs measurement boundaries, not a claim to implement every deduction rule.
  • https://www.rics.org/content/dam/ricsglobal/documents/standards/october_2021_nrm_2.pdf
  • Masonry/tiles: repeating module with joint, not a cutting layout; boundaries, bond and patterns need project take-off. No mortar, grout or strength calculation.
  • Paint uses practical product-datasheet coverage per whole coat. Plaster is wet volume only, not mix constituents. Stock matches product/unit and is allocated to this work.
  • Excavation is a vertical box only, without shoring/slope design. Swell and backfill ratio are project soil data, not code values. Backfill factor=loose/compacted volume; not an additional percentage counted twice.
  • Supply is separate from consumption; packs are whole. Excavation trips use loose volume and declared capacity; weight/road limits may increase trips. Results do not authorize construction.

Worked example

Three trenches 12.0 m × 2.5 m × 1.8 m deep with a 20% bulking allowance.

Worked example results
ResultValue
In-situ volume, not haul volume162 m³
Swell on in-situ volume32.4 m³
Requirement including loss before stock194.4 m³
Compatible stock used0 m³
Trips at declared loose capacity20 units
Planned hauling capacity, not excavation volume200 m³
Planned capacity excess from whole-trip rounding5.6 m³

These figures are produced by the same calculator engine used on this page.

Frequently asked questions

Does it add working space or side slopes?
No. It multiplies the dimensions you enter. If your method statement requires working space or battered sides, include them in the entered dimensions.
What bulking percentage is typical?
It depends on the soil and is entered by you. The calculator assumes no soil classification and applies no default other than zero.
How do I get the backfill quantity?
Use the Backfill Calculator, which deducts the volume occupied by structures and applies your own compaction factor.

Next step and related links

Free calculators are open to everyone, and CSV export is free for everyone too. Project saving and PDF/Excel reports come with Professional, and integrated workflows with Premium.