ProfessionalAvailable now

Civil BOQ

Build civil works bills of quantities.

This calculator is part of a paid level

Unlock this calculator with a single purchase; access stays on your account for life.

A civil BOQ collection page is arithmetic, not guesswork: quantity × rate for each line, a subtotal, and the percentage add-ons your commercial team has agreed. This tool keeps that chain transparent so the total can be traced back to every line item.

Method and assumptions

Evidenced dimensional measurement and quantity/rate bridge

  • Measured Q=compatible dimensions×count−total deduction, or direct Q−deduction
  • Current=rounded(Q×R); baseline=rounded(Q0×R0)
  • ΔQ=(Q−Q0)×R0; ΔR=Q×(R−R0); rounded variance=rounded ΔQ+rounded ΔR+rounding residual
  • Collection=Σ direct rows only; rows replace scalar totals
  • Prelim=direct×p%; reserve=(direct+prelim)×c%; OH=(direct+prelim+reserve)×h%; profit=(cost+OH)×f%; tax=pre-tax×t%
  • Legacy mode is fixed-item pricing without measurements, provenance or baseline comparison; references/measurement/comparison apply to new modes only.
  • https://www.energy.gov/sites/default/files/2024-08/gao-20-195g.pdf pp102/107: detailed estimate then roll-up. Rates/references/dates are replaceable examples; same currency, cutoff and scope.
  • Deduction is total per row, not multiplied by count. Dimensional method must match category unit; no curved geometry, normative measurement deductions or automatic mass conversion.
  • Baseline quantities/rates are independent. Quantity change uses baseline rate and rate change uses current quantity; each value is rounded with a separate rounding-reconciliation residual.
  • New mode: direct, preliminaries, contingency, overhead, profit markup, user-confirmed tax; zero tax default here. No combined OH&P in new mode and no repricing saved results.
  • Collection accepts direct subtotals only; loaded totals rejected and source references not repeated. Source content is user-declared, not verified against actual documents.

Frequently asked questions

Does Alasos supply unit rates?
No. There is no price database anywhere in the tools. Every rate is entered by you in USD from your own market data.
How are the percentage add-ons applied?
Cumulatively: preliminaries on the subtotal, overhead & profit on the result, then contingency on that — the standard collection-page sequence.
Can I consolidate several disciplines?
Yes, with the Multi-Discipline BOQ Generator, which rolls up per-discipline subtotals and applies the same add-on chain.

Next step and related links

Free calculators are open to everyone, and CSV export is free for everyone too. Project saving and PDF/Excel reports come with Professional, and integrated workflows with Premium.