MEP Field Kit

When to use it

When reading electrical loads: see how diversity affects actual load and approximate current, not an approved design.

Diversity factor: the share of installed load actually running at the same time.

What you get after purchase

  • Load schedule by density, demand and diversity factors, with maximum demand, apparent power, current, standard breaker and transformer and transformer loading.
  • Main cable with three independent checks: drop at operating-temperature resistance plus downstream allowance, capacity after temperature and grouping derating, and load ≤ breaker ≤ cable coordination, with the smallest compliant size.
  • Fault current against breaking capacity, power-factor correction capacitors and an essential-load generator, with three charts: connected versus demand, drop by size, and load, breaker and cable.
  • 31 inputs, eight metrics, four tables and three charts: maximum demand, current, breaker and transformer; main cable with operating-temperature drop, derated capacity, load ≤ breaker ≤ cable coordination and smallest compliant size; fault current, capacitors and generator. A planning estimate, not a certified design.
  • Bilingual 7-sheet Excel: range-checked controls, a 40-line load schedule, main supply (breaker, transformer, fault, capacitors, generator), 30 feeder checks for drop, capacity and coordination, editable standard lists, drop by size and a decision sheet with three charts; invalid data blocks results.
  • Gift book: MEP Engineers Field Reference.

A fixed-number teaching example, open to everyone before purchase, so you can see how it works.

Supporting your chances of success

This kit combines precise calculations with guidance and organisation to help you work towards your goal. We help you organise inputs, understand options and assess strengths and risks, then suggest practical steps suited to its subject — such as pricing, cash flow or marketing.

Guidance supports decisions, not guaranteed success; estimates depend on the accuracy of your inputs.

Understand the kit step by step

The example runs from the load schedule to the supply decision: maximum demand after demand and diversity factors, then current, breaker and transformer, then the main cable through three independent questions: is the drop within the limit at operating temperature? Is derated cable capacity above the breaker? Can the breaker interrupt the fault current? Finally, correction capacitors and an essential-load generator.

What to prepare before starting

Prepare area and lighting/socket densities, connected equipment loads and demand factors, voltage and power factor, cable length, size and runs, tabulated ampacity from the manufacturer table for the actual installation method with temperature and grouping factors, transformer impedance and breaker breaking capacity, the utility's required power factor and the essential-load share.

From information to a decision

  1. Enter loads: maximum demand = sum of (connected × demand factor) × diversity, and apparent power = maximum demand ÷ power factor.
  2. Current = kVA × 1000 ÷ (√3 × voltage); the breaker is the next standard size above design current with spare, and the transformer the next standard size above power with spare.
  3. Correct cable resistance from 20° to operating temperature (×(1+0.00393×(T−20))), add the cable drop to the downstream allowance and compare with the total limit.
  4. Cable capacity = tabulated × temperature factor × grouping factor × runs; check the order load current ≤ breaker ≤ cable capacity.
  5. Estimate fault current at transformer terminals = kVA ÷ (√3 × voltage × impedance) against breaking capacity, then capacitors = maximum demand × (tan φ1 − tan φ2) and generator = essential load ÷ loading ratio.
  6. In Excel record every feeder on the Feeders sheet; an incomplete row or unlisted size shows an error, any out-of-range control blocks results, and the decision sheet lists failing feeders and the smallest compliant size.

A simple example to explain the idea

2,500 m²: lighting 25 kW, sockets 62.5 kW, HVAC 320, pumps 30, lifts 40 and other 50 kW → demand 424.75 × 0.9 = maximum demand 382.3 kW, 424.8 kVA and 613 A, design 736 A with 20% → 800 A breaker and 630 kVA transformer (67% loaded). Two 240 mm² runs over 80 m at 90°: drop 1.29% + 1.5% downstream = 2.79% within 4%; smallest compliant size 120 mm². But capacity 430 × 0.91 × 0.8 × 2 = 626 A is below the 800 A breaker: coordination fails although the drop passes; a third run raises it to 939 A. Fault current up to 15.2 kA against 50, 59.5 kVAr of capacitors to reach 0.95, and a 250 kVA generator for 40% essential load at 80% loading.

These figures are illustrative, not approved prices or guaranteed forecasts; they may differ from the worked example below.

How to interpret and use the result

Passing voltage drop does not make a cable adequate: thermal capacity and protection are independent checks, and the example shows a cable that passes the drop and fails coordination. The fault figure is an upper bound because it ignores network and cable impedance and excludes motor contribution.

A common mistake to avoid

Planning estimate, not a substitute for the licensed engineer's design: it does not check selectivity between breakers, fault levels at sub-boards, motor starting or harmonics, and ampacity values and standard lists must come from manufacturer data and local utility requirements.

Reading the detailed operating plan

31 inputs, eight metrics, four tables and three charts: maximum demand, current, breaker and transformer; main cable with operating-temperature drop, derated capacity, load ≤ breaker ≤ cable coordination and smallest compliant size; fault current, capacitors and generator. A planning estimate, not a certified design.

Gift book with the kit

MEP Engineers Field Reference

After payment you choose the book edition — bilingual or English — and it is added to your library with the kit.