Facility Management & Maintenance Kit
When to use it
When budgeting maintenance: compute annual preventive cost from equipment count and visits.
Preventive maintenance: scheduled visits before failure to reduce breakdowns and their cost.
What you get after purchase
- Annual operating cost for six systems: planned, reactive, team and consumables, with cost per m² and the reactive-to-planned ratio.
- Replacements in their actual years by current age and surveyed condition, repeated and escalated within a horizon up to 30 years, with criticality × condition priority.
- Replacement fund under three options: no shortfall, average with bridge funding, and simplified straight-line with the year it runs out, plus three charts.
- 50 inputs, ten metrics, three tables and three charts: annual operations, replacements in their actual years by age and condition, a fund under three options (no shortfall, average with bridge funding, straight-line and when it runs out), and criticality × condition priority.
- Bilingual 6-sheet Excel: controls, 30 systems with age, condition, criticality and reserve, a 30-year plan with operations, replacements and three fund balances, a decision sheet with three charts and the monthly PPM task calendar; invalid data blocks results.
- Gift book: Facility Management & Building Maintenance Reference.
A fixed-number teaching example, open to everyone before purchase, so you can see how it works.
Supporting your chances of success
This kit combines precise calculations with guidance and organisation to help you work towards your goal. We help you organise inputs, understand options and assess strengths and risks, then suggest practical steps suited to its subject — such as pricing, cash flow or marketing.
Guidance supports decisions, not guaranteed success; estimates depend on the accuracy of your inputs.
Understand the kit step by step
The kit builds a realistic maintenance budget: annual operating cost (planned, reactive, team and consumables), then system replacements in their actual years by current age and surveyed condition, not an artificial equal instalment. The replacement fund compares three options: a contribution allowing no shortfall, a horizon-average contribution with bridge funding, and the simplified straight-line reserve that may run out before a major replacement.
What to prepare before starting
For each system prepare today's replacement value, planned maintenance rate, service life, current age, condition survey score (1–5), criticality (1–3) and any money earmarked for replacement. Also prepare area, reactive rate, team, consumables, operating and replacement inflation and the plan horizon.
From information to a decision
- Operating cost = planned (value × rate) + reactive (share of planned) + team × cost × 12 + consumables, inflated each year.
- Remaining life = life − age; poor condition caps it at two years and failed means replacement in year one.
- Each replacement falls in its actual year at escalated cost and repeats every life within the horizon.
- Fund: no-shortfall contribution = highest (cumulative − earmarked) ÷ year; average = (horizon total − earmarked) ÷ horizon and needs bridge funding equal to the lowest negative balance.
- Rank priority = criticality × condition, ties broken by least remaining life.
- In Excel record up to 30 systems and a horizon up to 30 years, with the monthly PPM task calendar; any invalid value blocks results.
A simple example to explain the idea
A 12,000 m² building: year-one operations 1,079,350 (planned 239,500, reactive 71,850, team 648,000, consumables 120,000). Fire systems are 19 of 20 years old and are replaced in year 2 (832,000 escalated); HVAC at 13 of 15 and plumbing in poor condition are replaced in year 3 (5,191,680). Ten-year replacements total 6,023,680. The straight-line reserve of 610,000 a year runs out in year 3; the no-shortfall contribution is 1,874,560, and the average 562,368 covers the horizon but needs bridge funding up to 3,936,576 in year 3. Top priority is fire systems.
These figures are illustrative, not approved prices or guaranteed forecasts; they may differ from the worked example below.
How to interpret and use the result
The straight-line reserve looks enough on paper but ignores clustered replacements; the real decision is between a higher contribution, bridge funding or a deliberate deferral of lower-priority systems. Reactive work above half of planned signals weak planned maintenance.
A common mistake to avoid
Replacement values are today's prices with escalation and no fund investment return; condition and ages need periodic technical surveys and SFG20 or manufacturer schedules, and the plan does not replace a maintenance specialist's audit.
Reading the detailed operating plan
50 inputs, ten metrics, three tables and three charts: annual operations, replacements in their actual years by age and condition, a fund under three options (no shortfall, average with bridge funding, straight-line and when it runs out), and criticality × condition priority.
Gift book with the kit
Facility Management & Building Maintenance Reference
After payment you choose the book edition — bilingual or English — and it is added to your library with the kit.

