Decoration & Finishes Kit
When to use it
Before buying paint: find net wall area after openings, then quantity by coats and coverage per litre.
Coverage: area one litre covers in one coat; it varies by surface and product.
What you get after purchase
- Room finishes calculator: door and window deductions, wall and ceiling paint by coats and coverage, and primer.
- Tiles in four sizes: tile and box count with waste, adhesive bags, grout and skirting.
- 49 inputs, four tables and three charts separating consumption from stock, pack purchases and surplus, execution costing, pricing and budget variance; theoretical gypsum boards and an all-in installed price.
- 49 inputs separate six material demands, matching stock, packs, surplus and consumed cost from new purchasing. Four tables and three charts; independent prices, labour, protection, overhead, contingency and margin, then actual/forecast and budget variance. Gypsum includes installation; tax and collections excluded.
- Bilingual Excel file: multi-room finishes schedule with quantity formulas, a material order summary that turns totals into packs of paint, primer, adhesive, grout and skirting with the order cost, and a finishes inspection checklist.
- Gift book: Field Encyclopedia of Decoration Works.
A fixed-number teaching example, open to everyone before purchase, so you can see how it works.
Supporting your chances of success
This kit combines precise calculations with guidance and organisation to help you work towards your goal. We help you organise inputs, understand options and assess strengths and risks, then suggest practical steps suited to its subject — such as pricing, cash flow or marketing.
Guidance supports decisions, not guaranteed success; estimates depend on the accuracy of your inputs.
Understand the kit step by step
A single-room workflow from measurement to demand and packs, then execution cost, quotation and budget review. The simple public paint lesson remains; the calculator covers six materials, gypsum, labour and protection. Stock consumption has a cost; reusable pack surplus is not automatically installation cost.
What to prepare before starting
Prepare valid dimensions and openings, paint system, product coverage, coats and one primer coat. Separate products, colours and batches; Excel pools only rooms sharing one material system, with a separate file for every different system. Prepare packs, rates, allocated usable stock, labour, budget, incurred actual and independent remaining cost.
From information to a decision
- Walls=2×(length+width)×height; deduct openings once and add the ceiling only if painted. Fractional counts and impossible openings are rejected.
- Paint=surface×coats÷coverage; primer uses one coat and independent coverage, then application loss once. Tiles include cutting allowance; adhesive and grout use product consumption on net floor area.
- Deduct matching usable stock, then round packs up; purchased quantity=packs×size, surplus=purchased−shortage. Tile boxes contain an integer count of the selected size.
- Price consumption independently; gypsum includes supply and installation on installed area. Painting labour per surface area includes all coats; add tile/skirting labour and protection without repeating gypsum.
- Overhead applies to direct cost, contingency to their sum; price=cost÷(1−selling margin). Contingency is not incurred cost and tax is excluded.
- Forecast=incurred actual+independent remaining cost; compare against same-scope budget, not purchase cash. Inspection needs specification, evidence, owner and due date; never verify closure without evidence.
A simple example to explain the idea
Public walls-only lesson:5×4×3m,54−6=48m²,two coats at10:9.6L. Unified full case:6×5×3m,one0.9×2.1m door and two1.5×1.2m windows;60.51m² walls,90.51m² paint surface with ceiling. Paint19.9122L with10%loss:two18L packs;primer8.29675L:one18L pack. Tiles33m²:23×1.44m² boxes;adhesive8×20kg bags;grout3×5kg packs;skirting37×0.6m pieces;12 theoretical gypsum boards. Purchases4588.40,consumption3989.30,gypsum1650,labour2304.92,protection500;8%overhead and5%contingency give9575.74 cost;20%margin gives11969.68 price. Actual3200+remaining6200=9400 versus9000 budget:400 overrun. Illustrative single-currency figures, not market prices.
These figures are illustrative, not approved prices or guaranteed forecasts; they may differ from the worked example below.
How to interpret and use the result
Consumption/purchase bars show stock and packaging effects; paint-loss sensitivity shows pack jumps; budget bars compare estimate and final forecast. Cost forecasting neither measures progress nor establishes profit or collections. The nine-sheet review file connects controls, rooms, purchasing, cost, actuals, inspection and decision using the same case; current downloads are not replaced.
A common mistake to avoid
One material system per file; separate colours, products and batches. Boxes are not a cutting layout; gypsum is a single-layer allowance, not framing or fire design. Skirting is separately purchased, not cut from floor tiles. Tapping is not bond proof; acceptance follows project specifications, not universal limits. Tax, financing and collections excluded.
Reading the detailed operating plan
49 inputs separate six material demands, matching stock, packs, surplus and consumed cost from new purchasing. Four tables and three charts; independent prices, labour, protection, overhead, contingency and margin, then actual/forecast and budget variance. Gypsum includes installation; tax and collections excluded.
Gift book with the kit
Field Encyclopedia of Decoration Works
After payment you choose the book edition — bilingual or English — and it is added to your library with the kit.

