Quality & snag indicators

First-pass acceptance and snag closure.

Project & Input Data

Embedded standards & references

  • HIOSH200000recordable-case rate; Orange Book risk principles, no universal bands

Results are engineering aids and require verification by a qualified professional before use on a real project.

Engineering Assumptions

Direct calculation — Bounded policy ranks and independent indicators

  • Matrix values are ranks1to5, not probabilities; no precise ranking of unlike risks or stop/proceed decision from the product. Bands are editable policy examples. EMV uses independent financial probability, not likelihood rank.
  • Claimed reduction stays separate from credited reduction; control verification is a source declaration for user review, not automatic audit. Certain response cost is added once, not tail simulation or P80 contingency.
  • Safety rate uses actual employee hours on the same entity/period and consistent case definition; no safe/unsafe colors or site authorization from low rates. LTIFR uses a declared million-hour convention, not an OSHA rule.
  • Quality uses unique inspections and observations from the same review cohort, with evidence-verified closure. Zero scope is not100%acceptance; diagnostic averages never authorize handover.
  • https://labor.hawaii.gov/hiosh/calculating-incidence-rates/
  • https://www.gov.uk/government/publications/orange-book

Formula Summary

  • Ordinal risk=likelihood rank×impact rank; bands are user-defined
  • EMV=independent probability×financial consequence; reduction credited only if evidence-verified
  • TRIR=recordable cases×200000/actual hours; LTIFR=losttimecases×1000000/actual hours
  • First pass=accepted firsttime/submitted;closure=verifiedclosed/total;zero denominator omitted

Definitions, not safety limits

MeasureBasis
TRIR200000employee-hours
LTIFR1000000hours declared convention
Matrixordinal1…5×1…5

200000base is sourced; risk bands are not a universal standard

Results

Enter your data and press Calculate to see the results.

Engineering Insight

Ranks, financial exposure and rates stay independent; a favorable indicator never compensates for missing evidence or controls.

Recommended Action

Review evidence, definitions, scope, period and company policy with a qualified reviewer before decisions.

Next step

This calculator is fully usable as it is. Professional adds saved projects, calculation history and PDF/Excel reports; Premium adds the integrated workflows and the BOQ generator.