Resource & crew planning

Crew size needed to finish a work quantity.

Project & Input Data

Embedded standards & references

  • Declared quantity/time/money identities, not contractual requirements

Results are engineering aids and require verification by a qualified professional before use on a real project.

Engineering Assumptions

Direct calculation — Constant crew capacity for one work type

  • One horizon and one currency. EVM requires earned progress weighted by fixed baseline budgets; no financial-for-physical substitution or finish date from SPI. EAC is a scenario, not independent estimate.
  • Delay is historical-average homogeneous-work scenario, not CPM or contractual delay forecast; zero progress gives no duration. Crew covers one work type at constant accepted output, no trade interchangeability or congestion effects.
  • Period certificate is illustrative; tax is on gross work, not a country tax rule. Verify criteria first. Prior certificates remain frozen outside this tool; receipts, advance and retention stay separate, no approval or entitlement. Pricing is markup of loaded cost, not sales margin.
  • https://www.energy.gov/sites/default/files/2019/07/f65/DOE%20EVMS%20Gold%20Card%2020190710.pdf

Formula Summary

  • workerDays=quantity/rate;crew=ceil(workerDays/days)
  • paidWorkerDays=crew×days;paidCost=paidWorkerDays×wage

Results

Enter your data and press Calculate to see the results.

Engineering Insight

Compare each balance separately; a rate, certificate or time valuation proves neither dates, acceptance nor receipts.

Recommended Action

Document baseline, horizon, quantities, rates and tax basis before accepting period arithmetic.

Next step

This calculator is fully usable as it is. Professional adds saved projects, calculation history and PDF/Excel reports; Premium adds the integrated workflows and the BOQ generator.