Construction Cost Calculator

Estimate overall construction cost.

This calculator is part of a paid level

Unlock this calculator with a single purchase; access stays on your account for life.

The gap between cost and price is where most bids are won or lost. This calculator builds the direct cost, adds the overhead and contingency percentages you set, and then prices it two ways — markup on cost or a target margin on price — so you can see the difference clearly.

Method and assumptions

WBS quantity-rate estimate

  • Direct=Σ rounded(quantity×direct rate); rows replace scalar categories
  • OH=rounded(direct×OH%); contingency=rounded((direct+OH)×contingency%)
  • Cost=direct+OH+contingency; price=cost×(1+markup%) or cost/(1−margin%)
  • Profit=price−cost, not the sum of overhead/risk/profit additions
  • GAO-20-195G2020 pp102/107: detailed WBS build-up and roll-up; not a rate database or NRM certification.
  • Rates/productivity come from project measurements and dated quotations; example values are not market prices. Use one currency, price basis, scope and review date; do not repeat resources included in all-in rates.
  • Source: https://www.energy.gov/sites/default/files/2024-08/gao-20-195g.pdf

Frequently asked questions

What is the difference between markup and margin?
Markup is a percentage added to cost; margin is a percentage of the selling price. A 20% margin needs a 25% markup — the calculator shows both modes.
Are taxes or VAT included?
No. The result is a pre-tax price in USD. Add any tax treatment separately according to your jurisdiction.
Does it use regional cost data?
No. Every cost and percentage is user-entered; there is no built-in cost database or index.